Q4) Using the time-cost trade-off concepts, determine the logical steps to reduce the following project duration. Additionally, calculate the following: Normal duration cost, Normal duration, Shortest duration cost, and Shortest duration. Note: Use the provided sample of the table as a guide in your solution. ST. Crash Cost Cost Difference S$/Day Time Normal Normal Crash Time Act. Difference ID Time Cost ($) (%$4) () A 1. 009 B. 7. 550 C. 250 D. 8. 6. 009 E. G. 9. 6. to 00 H. 3. 350 3. K. Table sample: Activity To Cost for Cycle Cost per Day Project Duration Total Days Shortened Shortened Can be Cycle Cost #3 Shorten 1335o31213

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
following project duration. Additionally, calculate the following: Normal duration
cost, Normal duration, Shortest duration cost, and Shortest duration. Note: Use the
provided sample of the table as a guide in your solution.
Q4) Using the time-cost trade-off concepts, determine the logical steps to reduce the
ST.
Cost
Difference $/Day
Time
Crash
Cost
(),
Difference
Normal
Cost ($)
Normal Crash
Time
(5)
Time
00
1.
3.
ID
000
250
1.
550
9.
7.
B.
C.
D.
5.
009
8.
6.
6.
5.
000
E.
F.
G.
3.
0099
1.
Project
Duration
350
1.
3
Cost
for
Total
Cost
H.
3
Cost
per
Day
3.
Days
Cycle
Table sample:
Activity
To
K.
Can be
Shortened Shortened
Cycle
#3
Shorten
Transcribed Image Text:following project duration. Additionally, calculate the following: Normal duration cost, Normal duration, Shortest duration cost, and Shortest duration. Note: Use the provided sample of the table as a guide in your solution. Q4) Using the time-cost trade-off concepts, determine the logical steps to reduce the ST. Cost Difference $/Day Time Crash Cost (), Difference Normal Cost ($) Normal Crash Time (5) Time 00 1. 3. ID 000 250 1. 550 9. 7. B. C. D. 5. 009 8. 6. 6. 5. 000 E. F. G. 3. 0099 1. Project Duration 350 1. 3 Cost for Total Cost H. 3 Cost per Day 3. Days Cycle Table sample: Activity To K. Can be Shortened Shortened Cycle #3 Shorten
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Cost control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning